Baltic: Power grids set to inform about exit from Russian system

The Baltic power transmission system operators (TSO) will notify Russia and Belarus about their decision to withdraw from the so-called BRELL agreement and the Moscow-controlled IPS/UPS transmission system in the coming weeks, Lithuania’s Ministry of Energy announced, BNS reports. The Baltic TSOs are fully ready to synchronise their power grids with the continental European system…

Read More

Baltic: Grid synchronisation to raise electricity prices minimally: minister

The planned synchronisation of the Baltic electricity grids with Western Europe in February 2025 will slightly increase electricity prices for consumers, according to Lithuanian Energy Minister Dainius Kreivys, BNS reports. The impact on prices will be minimal, around a few percent, he said. Lithuanian power grid operator Litgrid estimates that the synchronisation will cost consumers…

Read More

Estonia: Electrifying Harjumaa public transport would cost EUR 2bn

Electrifying the public transport system in Estonia’s Harjumaa county would require EUR 2bn in grid investments, Tallinn deputy mayor Kristjan Järvan stated, ERR reports. He said that the project would include major upgrades to both the distribution and transmission networks to support the increased use of electric vehicles. Electrifying Tallinn’s bus fleet alone would cost…

Read More

Estonia: Repairs on EstLink 2 power cable to last until August 2024

Estonia’s electricity transmission system operator, Elering, has finally located the fault in the EstLink 2 power cable connecting Estonia and Finland, ERR reports. Complexities due to the area’s terrain and the cable’s design mean that repairs will now extend until the end of August 2024, the company announced. Initially, Elering expected the cable to be…

Read More